Hello,
Is there any option to define the task weight (weight base on the whole project) and check if the summation weight of sub-tasks of a project or a task is equal to %100
For exmple:
WBS 1 = 40%
WBS 1.1=33%
WBS 1.2=67%
WBS 2 = 60%
For each level total sum of task weights are equal to %100.
Thank you