How is the date format (“%e/%c/%y”) effected in the example. I have tried cal1.setDateFormat(“%e/%c/%y”) unsuccessfully.
Thanks
Tony W
Hello,
the issue wasn’t reproduced locally. Please, take a look at the attached sample
1246864252.zip (70.4 KB)