Event time update by dragging event box

Is it possible to update event by dragging the event box (as a whole) to the right event time?
if so, how it can be done since the default behavour does not allow it (at least not in day view or week view)?

Can you please clarify?
Drag and drop of events is enabled by default screencast.com/t/HV2MTyvJNZ , probably you mean something else?

Why then it is not working here dhtmlx.com/docs/products/dhtmlxS … asic.shtml ?

Please clarify how can i reproduce the problem. On the first look it seems working correctly screencast.com/t/EhUuNst8

No need to reproduce the problem. It is the most basic scheduler example at dhtmlx.com/docs/products/dhtmlxScheduler (using firefox 35.0.1)

please clarify what the problem is. From your first two messages I assumed that the drag and drop not works for you in some cases.
I’ve tried to check it on the sample from your second reply - d’n’d seems working correctly there, please see the screencast in my previous reply.
Is there something else that i didn’t check before? right now i don’t understand what do you mean

The page at dhtmlx.com/docs/products/dhtmlxS … asic.shtml display the basic scheduler demo. Simply pressing with the mouse on the event box and dragging it to another place on the same week view, at the shecudler surface, does not work. The event box stays still. Nothing is changed. The event stays at the same place and nothing is changed. The browser I’m using is firefox 35.0.1. The same happens with Chrom. Maybe I’m doing something wrong?

As i’ve said, i’ve checked that demo in Chrome and FF and recorded a screen video - which shows no visible problems with drag and drop screencast.com/t/EhUuNst8
So far i can’t reproduce the problem. Maybe you can record a screencast showing the bug?
btw, note that in week/day/units drag and drop can be performed only by header and footer part of an event screencast.com/t/JwTR1Ihp8GP
If try dragging the event body- it won’t work. Dragging the multiday event bars at the top part of the scheduler is also not possible.

It works, pressing the event box header moves around the event box, but only by pressing the header. I did not succeed with the event box footer, since the cursor changes to double sided arrow which only allows expanding or shrinking event box. Is it possible to change this behavior such that pressing anywhere on the event box body (multi day or not) will allow to move it around the week view (like google calendar)?

Unfortunately no. The events can be moved only using header part, and multiday events in a top section of a calendar can’t be moved at all. Currently there is no easy way to bypass this