Hello! How block sectors already available in base events?
How on picture in attach.
This is possible?
For example i have 3 events in the database. they are loaded and blocked
Hello! How block sectors already available in base events?
How on picture in attach.
This is possible?
For example i have 3 events in the database. they are loaded and blocked
Hi,
If you want to prevent double events creation in a time slot, please check the article how to implement it:
docs.dhtmlx.com/scheduler/collisions.html