Hello -
In unit view, when multiple resources are assigned, I cannot drag an event to a different resource like I can in timeline view.
Using the following sample file:
/samples/12_multisection_events/01_multisection_events.html
Clicking on Units view, then dragging “Task 1,3” to another column not possible.
I’ve tried it with the following option as well, which is the behavior that I’m looking for:
scheduler.config.multisection_shift_all = false;