Hi,
we have one last problem to buy dhtmlx gantt.
The problem is that the customer want to
have one task and the events on the same line.
For example I have task 1 on 10/04/2018 and after 11/04/2018.
We don’t want to have two line but only one line.
Is possible?
For example
Task1—event, event, event
and not
Task1—event
Task1—event
Is possible or not?