Hi,
This year in Europe the daylight saving days are 27/03 and 30/10. In these days the events I have in my scheduler timeline are displayed 1h shifted. In March it shift 1 hour to the left, and in October 1 hour to the right.
A capture of this error in October: i.imgur.com/lRI6FPL.png (the events start and end at 8h, but they are painted at 9h)
How can I prevent that?
Thx
PD> I’ve the last version 4.3.25 Professional