Hi, I’m having trouble with my scheduler with scheduler.config.start_on_monday set to false.
When it’s set to ‘true’ everything works great, but as soon as I set it to ‘false’, all the dragging (resizing, moving & creating) goes loopy. Moving isn’t TOO bad, it’s just jumps by about 45 minutes, and dragging an event to 00:00 sets the start time to 01:00, but resizing & creating do really strange things. It happens in both IE & Firefox.
I can’t find a sample on the dhtmlx site with start_on_monday set to false, so I can’t test it there.