Scheduling 1 day duration

How can I schedule tasks for 1 day? As per the default setup, if the duration is 1 day, the end date will be the start date +1.

Required setup: If duration is 1 day, the start and end date will need to be the same.

Hello.
You can find detailed information in the following article: Data Loading Gantt Docs